190 Proof Alcohol Railcar Loading Skid Just Installed – S&S team onsite doing startup this week in Kansas. This system includes a 2″ denaturant line and includes additive injection from (3) additives located off skid with additive pumps and meters. Design includes a 6″ 1000gpm 20 micron ASME filter vessel, Scully Ground Hog and Scully overfill monitor, 316SS pipe & valves, 4″ Promass coriolis meter, Flo-Tite pneumatic control & On/Off valves, FMC Accuload IV controller.

Need help with railcar loading skid packages complete with loading racks, access gangways & safety cages, loading arms, spill pans with options for installation, foundations, piping ISO’s, IFC drawings, PE Stamped – give us a call at 678-250-9507

190 Proof Alcohol Railcar Loading Skid