Acetic Acid Transload Unit Up and Running – Erected and Commissioned Onsite By S&S Team. Unit included both top of rail and top of truck access, heat traced/insulated safety shower package with upper and lower-level shower/eye wash stations, touchscreen HMI controls, hose handlers, mag drive pump, priming chamber, pressure/temperature transmitters, lined piping, vapor balance line, E&H mag meter, and CPVC cover plate with overfill probe. S&S provided in house erection service and provided startup/commissioning and operator training. Erection of shop tested modular system took one (1) day.