Palm Oil Ship to Rail Mobile Transloading Project Up & Running. S&S commissioned (3) mobile transload units this week complete with S&S fabricated mobile connex building with PLC that has capability to control the Toptech Multiload units from the connex, remote ESD, Wi-Fi BOL ticket printing back to main offices on site, CCTV cameras, HVAC and insulated walls. Transload units are designed for 1,000gpm load rate and have 4″ Micromotion meters, stainless piping, 6″ loading arms, Safe Harbor access gangways and safety cages and overfill protection. The palm oil loading is seasonal and all equipment has to be removed from the dock and stored in a warehouse on site when not in use. All equipment is designed to plug into mobile diesel generators.
Need help with complete solutions inclusive of controls package and in house built connex buildings outfitted to your specs – give us a call ( (678) 250-9507