Progress Being Made. S&S designed/fabricated dual sided truck & railcar loading rack project for a client loading fatty acid. Structure is up. Pipe work, metering/controls, loading arm install & electrical next up. The package included the rack/canopy design & fabricated structure, PE stamp, loading arms, controls, overfill protection, access & fall protection with track mounted gangway on the rail side.

Need help on your next truck or railcar loading project , Give us a call at (678) 250-9507